ES3D story
The interactive 3D model, with 35 layers you can switch on and off and 10 story scenes.
Renders of the Haib Copper Project built from the October 2026 pre-feasibility layout. The open pit, waste rock dump, processing plant, TSF4, solar plant, dams and power lines are placed from the engineering files, on 10 m survey terrain at true scale, draped with 1 m satellite imagery.
Same camera, same light. Left is the valley today; right is the site as laid out in the PFS.
TodayPFS layout
Each view was rendered in Blender Cycles from the same master scene, so the facilities line up from every angle.
A block of ground sliced east to west through the PFS pit. The orange line is the pre-mining surface, so the gap below it is the rock to be mined out. The rock texture on the cut face is illustrative; no orebody is shown.
Every facility drawn from the PFS engineering files over the true-scale terrain, keyed to the legend, with 20 m contours and locator maps.
From the Orange River, over the gorge dam, the plant and the pit, then out to the full site.